
Canadian rural borehole drilling faces strict geological and cost limits. Local contractors need compact rigs for scattered farm water projects. This case covers our small water drilling machine project in Alberta, Canada. The client is a local 12-year family drilling contractor. It serves farm domestic water, irrigation wells, and residential boreholes.
The client previously used second-hand American drilling equipment. The old rigs caused many operational problems. Heavy rigs could not pass narrow rural farm roads. Outdated devices often got stuck in local sandstone and clay strata. Local shops lacked matching spare parts. Each equipment failure caused 1 to 3 days of downtime. The client lost about 320 CAD per idle working day.
The client searched Google for a professional small well drilling machine manufacturer. They screened three Chinese suppliers. They chose YG Machinery after factory video audits and test verifications. The client required a drilling depth of 200 m, a lightweight body, and automatic drill rod locking.
Equipment Parameter Matching & Standard Configuration
We provided two matched small water drilling machine models for different Canadian drilling scenarios. Both devices weigh only 200kg. They fit local pickup truck transport rules. The automatic thread design greatly cuts manual assembly time for field workers.
| Specification Item | YG-240-22P | YG-240-30P |
|---|---|---|
| Overall Dimension | 1450*1550*1970mm | 2000*1230*2090mm |
| Net Weight | 200kg | 200kg |
| Drill Rod Diameter | 42mm | 51mm |
| Single Rod Length | 1.5m/unit | 1.5m/unit |
| Rod Lock Method | Full automatic screw thread | Full automatic screw thread |
| Max Drilling Depth | 200m | 200m |
| Diesel Engine Power | 22HP | 30HP |
| Drilling Hole Diameter | Within 280mm | 100mm-240mm |
| Lifting Height | 2.5m | Max 2.5m |
| Lifting Force | 1000kg | 2000kg |
We delivered complete supporting accessories for Canadian construction needs. The package includes sandstone-adapted diamond bits, hydraulic filter kits, and wear spare parts. We provided English operation manuals and full CE certification files. All machines passed 4-hour continuous load tests before packaging and shipment.


Project Timeline, Shipping & Remote Commissioning
This portable borehole drilling machine export project took 47 working days in total. The whole process ran on schedule without delays. We adopted standardized procedures for overseas order execution.
- Day 1–7: Confirm geology data, issue quotation and sign formal contract
- Day 8–18: Complete machine assembly and factory performance testing
- Day 19–23: Finish anti-rust treatment, wooden case packaging and document sorting
- Day 24–36: Sea freight from Shanghai to Vancouver with full cargo insurance
- Day 37–42: Complete customs clearance and inland transportation to Alberta
- Day 43–47: Finish remote debugging, training, and first test well drilling
We used heat-treated wooden cases to pass Canada port quarantine. All hydraulic oil adopted a low-temperature-resistant formula for Canadian cold weather. Our engineers provided 24-hour real-time video guidance. Client operators mastered full operation skills in only 3 hours. The first test well reached a depth of 162 meters with stable water flow.
Operation Effect, Client Feedback & ROI Analysis
The new small water drilling machine greatly improved the client’s construction efficiency. Single well drilling speed rose by 41% compared with old equipment. A standard 100m well only needs 3.6 hours instead of 6.2 hours. The automatic rod structure cuts manual labor by nearly half. Monthly maintenance costs decreased by 58% after equipment replacement.
The lightweight 200kg design adapts to all local farm roads. It solves drill rod sticking problems in sandstone strata completely. We collected real financial data for accurate ROI calculation. Total procurement cost, including machines, accessories, and freight, is 14,600 CAD. The client gains 2,150 CAD extra monthly order revenue.
Monthly saved downtime and maintenance costs reach 820 CAD. The total monthly net income increase is 2,970 CAD. The theoretical payback period is 4.9 months. The actual payback took 10 months due to local construction off-seasons. The client plans to purchase three more units in the next year.

Professional Maintenance Suggestions
Proper maintenance extends the service life of your small water drilling machine. Replace hydraulic oil every 80 working hours for cold Canadian climates. Clean filter elements after each drilling task to avoid pipeline blockage. Check automatic thread parts before every startup to prevent rod-falling accidents.
Store the rig in a dry warehouse in winter to avoid pipeline freezing. Coat lifting components with anti-rust grease every month. Record all maintenance time and items strictly. Standard daily upkeep can ensure over 5 years of stable machine operation.
B2B Procurement Advice for Buyers
When choosing a small well drilling machine manufacturer, verify real export cases first. Match machine parameters with local geological conditions, not just price. Confirm complete English technical documents and stable spare parts supply.
Prioritize suppliers that offer free remote overseas training. Check CE certification and low-temperature resistance for North American projects. Reasonable model selection greatly reduces later operation and maintenance costs.


Get Custom Drilling Solutions & Free Quotation
This Canada export case proves YG Machinery’s reliable drilling equipment and mature export service. Our professional team provides targeted solutions based on your local geology and project needs. You can send your required drilling depth and hole diameter to get a free custom quote. We will reply with model recommendations and technical support within 24 hours. Browse more global drilling cases to check our stable quality and after-sales service.








